Line 8 and Line 9 Operation MIP

Feasibility study, preliminary PPP modeling, and demand analysis for the unsolicited proposal (MIP) for the operation of commuter train Lines 8 and 9.

SATrans Corridors

Institutional-financial diagnosis and feasibility study for transport projects in Santo André within the scope of IDB funding.

Functional Line 13–Jade

Cost-benefit economic analysis and evaluation of externalities for the functional designs of the CPTM Line 13–Jade extensions.

Line 13 – Section 1

Economic-financial feasibility study for the implementation of CPTM Line 13–Jade.

Line 6 – Orange

Economic-financial certification and accounting obligation audit for the sponsored concession contract of Line 6–Orange of the São Paulo Metro.

Line 18 – Bronze

Advisory on economic-financial modeling, risk structure, and drafting of the bidding notice for the EMTU Line 18–Bronze PPP.

Vehicle Yard

Preparation of the final economic-financial PPP modeling for the implementation and operation of the Integrated Vehicle Yard in the State of São Paulo.

plugins premium WordPress