Line 8 and Line 9 Operation MIP

Feasibility study, preliminary PPP modeling, and demand analysis for the unsolicited proposal (MIP) for the operation of commuter train Lines 8 and 9.
SATrans Corridors

Institutional-financial diagnosis and feasibility study for transport projects in Santo André within the scope of IDB funding.
Review of the Methodology Applied to Economic and Financial Feasibility Studies within the Scope of Advisory, Analysis, Validation, Verification, and Support for the Approval of Functional Designs for New Lines of the Subway Network

Methodological review and enhancement of socioeconomic and financial feasibility studies for new lines of the São Paulo Metro.
Functional Line 13–Jade

Cost-benefit economic analysis and evaluation of externalities for the functional designs of the CPTM Line 13–Jade extensions.
Line 13 – Section 1

Economic-financial feasibility study for the implementation of CPTM Line 13–Jade.
Line 6 – Orange

Economic-financial certification and accounting obligation audit for the sponsored concession contract of Line 6–Orange of the São Paulo Metro.
Economic-Financial Feasibility Analysis and Modeling for the Sponsored Concession of Line 6-Orange of the São Paulo Metro

Analysis of the economic-financial feasibility study, risk structure, and advisory on bidding documentation for the Line 6–Orange PPP.
Line 18 – Bronze

Advisory on economic-financial modeling, risk structure, and drafting of the bidding notice for the EMTU Line 18–Bronze PPP.
Technical Support for the Evaluation of the International Bidding and Formalization of the Line 18 – Bronze PPP of the São Paulo Metro

Technical support to the Bidding Commission in the evaluation of proposals and contractual formalization of the Line 18–Bronze PPP.
Vehicle Yard

Preparation of the final economic-financial PPP modeling for the implementation and operation of the Integrated Vehicle Yard in the State of São Paulo.